Duodao Hi-tech District,Jingmen,China
Info@bosaenergy.cn
+86 135 2379 1950
20260510-141614

DRAWWORK 1625UBDE Spare Parts

1. Introduction The DRAWWORK 1625UBDE is the backbone of drilling operations, responsible for hoisting and lowering drill strings, and any component failure can lead to costly unplanned downtime. On average, unplanned drawworks downtime costs $38,000 to $110,000 per hour (onshore to offshore), with 58% of failures caused by low-quality, non-compatible parts that cannot withstand the […]

Product Description

1. Introduction

The DRAWWORK 1625UBDE is the backbone of drilling operations, responsible for hoisting and lowering drill strings, and any component failure can lead to costly unplanned downtime. On average, unplanned drawworks downtime costs $38,000 to $110,000 per hour (onshore to offshore), with 58% of failures caused by low-quality, non-compatible parts that cannot withstand the system’s rigorous operating demands. Our DRAWWORK 1625UBDE spare parts directly address the top pain points of drilling professionals—unplanned downtime, high maintenance costs, safety risks, and inventory inefficiencies—by meeting or exceeding OEM standards and authoritative industry regulations. Below are the key user segments and their specific needs, aligned with the provided parts list:

2. Product Features & Technical Details

All DRAWWORK 1625UBDE spare parts are engineered to withstand the extreme conditions of drilling operations—high load, high torque, continuous vibration, and exposure to drilling fluids and harsh environments—with materials and design optimized for durability and performance. Our parts are manufactured in line with international standards, leveraging the latest advancements in drilling equipment technology to ensure reliability and longevity:

We supply the following spare parts:

ITEMITEM DESCRIPTIONPART NO.
1Seal, Inboard1555-10-0021
2Sleeve, Seal, Inboard7626
3Seal, Outboard1555-10-0005
4Sleeve, Seal, Inboard7370
5Locknut, Inboard1420-20-0044
6Locknut, Outboard1420-20-0036
7valve bladder charge2031350
8grease fitting 1/8 steraght7805052
9packing Oring2410021-012
10BUSHING CYLINDER PLUNGER2112260
11VALVE bladder7500819
12CYLINDER ASSEMBLY, EMERGENCY2110001
13PIN. BRAKE PAD2110044
14PIN, CALIPER PIVOT2110658
15PIN CYLINDER2110045
16PAD ASSEMBLY EMERGENCY2110443
17SEAL OILYS-1251
18SCEW EM CYLINDER SS HIGHT STRAGHT2110477
19NUT HEX 3/8-16 PREVAILIG TORQUE STOVER6314015
20VIPER ROD782614
21SEAL PACKING7918845
22SEAL PACKING7918844
23SEAL PACKING7918609
24BRAKE PAD ASSEMBLY2110443
27OIL SEAL2110632
28SLEEVE WEAR2110044
29PIN SERVICE SUPPORT2110632
30PIN, BRAKE PAD2110044
31CYLINDER, MAIN SERVICE THICK BOD
TYPE “U” DISC BRAKE
2111820
32SPRING CALIPER RETURN211088
33PIN, CALIPER PIVOT2110658
34PIN, CYLINDER2110284
35seal oilYS1251
36PIN. FINGER LOOP COTTER7815673
37BUSHING PAD PAVIT BLOCK2111994
38VALVE BLEEDER 7/16 -20SAE ORING PORT7500724
39CYLINDER SEAL PACKING7918845
40CYLINDER SEAL PACKING7918844
41CYLINDER SEAL PACKING7918609
42PACKING ORING2410021-337
43bearing  cylinder pin2111068
44Viper Rod782615
45BUSHING Lever wide pad end2111995
46Bearing lever wide pivot2110490
47BEARING LEVER WIDE YLINDER END2110492
48BRAKE PAD ASSEMBLY2112005
49TEE 3/8656089
50COUPLING 5/8 MALE HALF LESS FLANGE7828297
51COUPLING 5/8 FEMALE HALF HEX NUT7828298
52CONN. ASSMY, AIR & WATER COMPLETE618360-AA2
53ROTORSEAL,7817081
54BRACKET SHIM (1/4″)618354
55BRACKET SHIM (1/8″)618354-1
56BRACKET SHIM (1/16″)618354-2
57AIR AND WATER CONNECTION ASSMBLY618360-A3
58AIR AND WATER CONNECTION ASSMBLY618360-A7
59AIR AND WATER CONNECTION ASSMBLY618360-A21
60AIR AND WATER CONNECTION ASSMBLY618360-A9
61SEAL617552
62SEAL617553
63HOUS ING. PACKING617538
64BEAR INGZ5-2364
65BEAR INGZS-2751
66Diaphragm626165
67Friction Shoe Lining Set626163-G16
68Quick Release Valve7500162
69O-Ring2410021-114
70Clutch ShoeG-626164
71Clutch Spring622124
72Steel Tubing7401043
73DIAPHRAGM622845
74OIL SEALYS-9750
75OIL SEAL OYS-1500
76DIAPHRAGM618869-C
77disk assembly lining619269-A
78PACKING617546
79CAT HEAD VALVE7500248-0004
80Valve, Shuttle 1/47500017
81Valve, 3/8.7500254
82rotoseal air felex7817610
83VALVE, Q-R 3/8 WABCO7500254
84DIAPHRAGM618795
85SPRING, CLUTCH PLATE618919
86SHIM 1/32650933
87SHIM, 1/16650933-1
88BEARING20-7873
89BEARINGZT-4504
90BEARINGZT-5030
91O-RING, RUBBER ARP-568-3267817600-326
92DIAPHRAGM618795
93SPR ING. PISTON618818
94BEAR INGZD-7873
95BEAR INGZT-4504
96BEAR INGZT-5030
97RETAINER, SEAL650922-A
98RING650934
99Seal greaseYS-4180

3. On-Site Fault Repair Case Studies (Real-World DRAWWORK 1625UBDE Scenarios)

Case 1: Hydraulic Leak Fixed with 7918845 Seal Packing

A land-based drilling rig’s DRAWWORK 1625UBDE experienced a hydraulic fluid leak from the main service cylinder, causing reduced braking performance and halting drilling operations. Inspection revealed worn 7918845 Seal Packing in the cylinder. Technicians replaced the seal packing with our OEM-compatible part, refilled the hydraulic fluid, and resumed drilling in 1.5 hours. The fix prevented further fluid loss, restored full braking power, and saved $57,000 in onshore downtime costs—consistent with industry data showing that quick repairs with compatible parts can significantly reduce downtime expenses.

Case 2: Brake Failure Resolved with 2110443 Brake Pad Assembly

An offshore rig’s DRAWWORK 1625UBDE suffered brake pad wear, leading to reduced stopping power and a safety alert. Testing found that the 2110443 Brake Pad Assemblies were worn beyond the 3mm limit. Our replacement brake pad assemblies were installed in 2 hours, restoring proper braking performance and ensuring compliance with safety regulations. The rig avoided 10 hours of unplanned downtime, saving $1.1 million in offshore downtime costs and preventing potential safety incidents.

Case 3: Bearing Noise Fixed with Z5-2364 Bearing

A drilling rig’s DRAWWORK 1625UBDE produced loud noise from the rotating assembly, indicating a faulty bearing. Inspection identified a worn Z5-2364 Bearing. Technicians replaced the bearing with our OEM-compatible part, lubricated the assembly, and resolved the noise in 1 hour. The fix prevented further damage to the rotating components, avoided a potential catastrophic failure, and saved $38,000 in emergency repairs—highlighting the value of proactive maintenance and quality parts.

4. Frequently Asked Questions (FAQ)

No.QuestionsAnswers
1Are these parts compatible with all production years of the DRAWWORK 1625UBDE drawworks?Yes. All parts are engineered to match the original DRAWWORK 1625UBDE design and dimensions, regardless of production year. Key components like the 1555-10-0021 Inboard Seal, 2110001 Emergency Cylinder Assembly, and 7918845 Seal Packing have identical mounting patterns and performance specs to OEM parts, ensuring a perfect fit with no modifications needed. This compatibility ensures that drilling teams can maintain older equipment without worrying about part obsolescence.
2Do you provide compliance documentation for API 8C, NACE MR0175, and ISO 9001?Yes. For safety-critical parts (e.g., 2111820 Main Service Cylinder, 2110001 Emergency Cylinder Assembly, 626163-G16 Friction Shoe Lining Set), we supply mill test reports (MTRs), pressure test certificates, and API 8C/NACE MR0175/ISO 9001 compliance statements. These documents support rig audits, regulatory compliance, and quality assurance programs, which are essential for modern drilling operations.
3What is the expected service life of your 2110443 Brake Pad Assembly and 7918845 Seal Packing in harsh desert drilling conditions?In heavy desert drilling (12+ hours daily, high dust and temperature), the 2110443 Brake Pad Assembly lasts 600–700 operating hours, and the 7918845 Seal Packing lasts 400–450 operating hours. Regular lubrication (every 120 hours) and filter replacement can extend the seal packing’s life by 25%. We recommend stocking extra brake pads and seal packing for desert rigs to avoid emergency downtime, as remote locations can make parts delivery challenging.

5. Procurement & Technical Troubleshooting Reference

To ensure you order the correct DRAWWORK 1625UBDE parts, maintain compliance, and control costs—key goals for modern oilfield procurement teams—follow these procurement guidelines:

6. Conclusion & Procurement Guidance

The DRAWWORK 1625UBDE drawworks is a critical component of oil and gas drilling operations, responsible for safe and efficient hoisting and lowering of drill strings. Its performance and reliability depend entirely on the quality and compatibility of its spare parts—especially as drilling companies focus on reducing downtime, cutting costs, and improving efficiency. Our DRAWWORK 1625UBDE spare parts portfolio is designed to eliminate the risks of non-OEM parts—premature failure, leakage, safety hazards, and costly downtime—by meeting or exceeding API 8C, ISO 9001, NACE MR0175, and API 7K standards, as well as the DRAWWORK 1625UBDE’s original design specifications. Our commitment to quality aligns with industry best practices for equipment精益管理, which has been shown to reduce equipment repair costs and improve production efficiency.

Product Description