Duodao Hi-tech District,Jingmen,China
Info@bosaenergy.cn
+86 135 2379 1950
屏幕截图 2026-06-28 122436_new

CSF-1300 Mud Pump Safety System Parts

Product Introduction Our CSF-1300 safety system parts are premium OEM-equivalent components designed to safeguard the pump and entire drilling rig from catastrophic overpressure events, covering the JA-3 shearing safety valve and KB75 air dome assemblies. The lineup includes precision shearing pins, pistons, airbags, pressure gauges, seal rings, valves, and standardized fastening hardware, crafted from heat-treated […]

Product Description

Product Introduction

Our CSF-1300 safety system parts are premium OEM-equivalent components designed to safeguard the pump and entire drilling rig from catastrophic overpressure events, covering the JA-3 shearing safety valve and KB75 air dome assemblies. The lineup includes precision shearing pins, pistons, airbags, pressure gauges, seal rings, valves, and standardized fastening hardware, crafted from heat-treated alloy steel, explosion-resistant elastomers, and pressure-rated industrial materials. All components meet strict API 7K and drilling pressure safety benchmarks, making them the trusted choice for safety compliance, routine safety maintenance, and emergency safety system repairs.

Functional Specifications

  • Overpressure Emergency Protection: The JA-3 shearing safety valve activates automatically at pre-calibrated pressure thresholds, shearing the designated shear pin to rapidly relieve excess pressure and prevent pump or rig structural damage, with a 0-25Mpa operating range perfectly matched to CSF-1300 pump specifications.
  • Hydraulic Pressure Stabilization: KB75 air dome components regulate system pressure fluctuations, absorb hydraulic shocks from pumping cycles, and maintain stable mud pressure to reduce stress on safety and fluid end parts, extending overall pump service life.
  • Real-Time Pressure Monitoring: 0-25Mpa pressure gauges provide clear, accurate pressure readings, enabling technicians to detect abnormal pressure spikes before they escalate into safety hazards.
  • Leak-Free Pressure Sealing: High-pressure seal rings, gaskets, and airtight joints maintain consistent pressure integrity, preventing pressure leaks that compromise safety device functionality and reliability.
  • Reliable Emergency Activation: Precision-machined shearing pins, locking springs, and piston assemblies ensure consistent, predictable safety valve activation with zero false trips or failed emergency shutdowns in critical moments.

Structural Characteristics

These CSF-1300 safety system components feature a rugged, safety-optimized structural design: the JA-3 shearing valve uses a modular piston-and-shear pin assembly for quick, hassle-free replacement of worn safety parts, while the KB75 air dome incorporates a reinforced shell assembly and heavy-duty airbag for superior shock absorption. All fastening hardware (pins, nuts, washers) is pressure-rated and corrosion-resistant, with a compact, pump-integrated design that fits seamlessly into the CSF-1300’s existing safety system without modifications or reconfiguration.

Applicable Operating Conditions

These safety components are engineered to perform reliably in the harshest drilling environments: onshore deep-well oil/gas drilling, offshore platform well servicing, directional drilling, geothermal drilling, and high-pressure abrasive mud circulation operations. They tolerate extreme temperature fluctuations (-20°F to 220°F), corrosive drilling fluids, continuous high-pressure cycling, and high-vibration rig conditions, maintaining full safety functionality in remote land rigs, offshore vessels, and high-risk drilling sites worldwide.

Maintenance & Servicing Recommendations

To ensure continuous safety functionality and unbroken regulatory compliance, follow these industry-approved maintenance protocols: inspect JA-3 shearing valve components (shearing pins, pistons, springs) every 300 operating hours for wear, corrosion, or deformation, replacing worn parts immediately to preserve activation reliability; test safety valve activation pressure quarterly to verify compliance with pre-set OEM thresholds; inspect KB75 air dome airbags and seal rings every 450 hours for leaks, cracks, or degradation, replacing damaged airbags promptly to maintain pressure stabilization; calibrate 0-25Mpa pressure gauges semi-annually to ensure accurate, trustworthy readings; tighten all fastening hardware to OEM torque specifications to prevent pressure leaks; and store rubber and elastomer safety components in a dry, temperature-controlled environment to preserve material integrity and extend shelf life.

  • We supply the following spare parts:
 JA-3 Shearing safety valve 
S/NNameCode
1JointCS3303-01
2Retaining ringCS3303-02
3Piston assemblyCS3303-03.00
4 ValveCS3303-04
5Piston rodCS3303-05
6Buffer padCS3303-06
7Elastic cylindrical pinCS3303-07
8Locking springCS3303-08
9Safety coverCS3303-09
10Shearing plateCS3303-10
11Searing pinCS3303-11
12Warning nameplateCS3303-12
13Pin rollCS3303-13
14Wire retaining ringCS3303-14
15NameplateCS3303-15B
16Split pin 4×25GB91-76
17Nut M4GB52-76
18Nut   M4×6GB67-76
19Nut   M10×100GB30-76
 KB75 air dome (CS33002-00) 
S/NNameCode
1Seal ring R30CS33001-05.35.13
2Bottom plugJZR3-18
3AirbagY-60
4Shell assemblyPJC1-L8
5CoverCS33002-08.00
6Three-way 1/4NPTCS33002-07
7Joint 1/4NPTCS33002-06
8Cover assembly of pressure gaugeCS33002-05
9Vent valveCS33002-04.00
10Pressure gauge 0-25MpaCS33002-03.00
11Angle stop valveCS33002-02
12WasheCS33002-01

Field Failure Repair Case Studies

Case 1: Fatigued Shearing Pin Causing Safety Valve Failure

A land drilling rig experienced a sudden pressure spike on a CSF-1300 pump, with the JA-3 shearing safety valve failing to activate due to a metal-fatigued shearing pin. Replacing the OEM-grade shearing pin, locking spring, and piston assembly restored proper safety valve functionality, passing all pressure safety tests and preventing potential rig overpressure damage.

Case 2: Ruptured Airbag Degrading KB75 Air Dome Performance

An offshore service crew reported unstable pump pressure and frequent hydraulic shocks, traced to a ruptured airbag in the KB75 air dome. Installing a new airbag, R30 seal ring, and bottom plug eliminated air leaks, restoring consistent pressure stabilization and reducing stress on the pump’s fluid end components.

Case 3: Malfunctioning Pressure Gauge Leading to Unmonitored Spikes

A remote drilling rig faced an unforeseen overpressure risk due to a faulty 0-25Mpa pressure gauge that provided inaccurate readings. Replacing the gauge, cover assembly, and angle stop valve restored real-time pressure monitoring, allowing technicians to detect and resolve pressure anomalies before safety risks escalated.

Frequently Asked Questions (FAQ)

QuestionAnswer
Are these safety parts compatible only with the CSF-1300 mud pump?Yes, all components are precision designed exclusively for the Sichuan Petroleum CSF-1300 mud pump, matching OEM specifications for the JA-3 shearing safety valve and KB75 air dome exactly.
What pressure range is the CSF-1300 safety system rated for?The complete safety assembly is rated for 0-25Mpa operating pressure, perfectly aligned with the CSF-1300 mud pump’s standard working pressure range.
Do these parts include all hardware for full safety system assembly?Yes, this list includes all required pins, nuts, seal rings, joints, and fasteners for complete assembly and repair of the JA-3 shearing valve and KB75 air dome.

Conclusion & Procurement Guidance

This CSF-1300 mud pump safety system parts list is your definitive, API-compliant resource for safety-critical procurement, maintenance, and repair needs for the CSF-1300 pump. It eliminates the risk of using non-compliant or ill-fitting safety components, provides clear part numbers and specifications for seamless, regulatory-aligned ordering, and establishes a reliable technical standard for troubleshooting safety system malfunctions. Whether you are restocking routine safety spares, repairing a faulty JA-3 shearing valve, or servicing a KB75 air dome, this guide provides all critical details to make informed, safety-focused purchasing decisions. Choosing these certified, field-proven safety components ensures your CSF-1300 mud pump meets global drilling safety regulations, prevents costly overpressure incidents, protects rig personnel and equipment, and minimizes safety-related downtime. Reach out to secure these essential CSF-1300 safety system parts and maintain a fully compliant, reliable safety system for your drilling operations.

Product Description